Non-Compliance detail


  
Summary
 
Licence number: 1683
Annual Return Start: 01 Jul 2021
Annual Return End: 30 Jun 2022
Date Received: 29 Aug 2022
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L2.2 Burwood Beach WWTW did not meet the ‘Coastal Water’ load limit for Selenium during the licence period. EPA action determined as part of scheduled inspection program 1
L2.2 Shortland WWTW did not meet the ‘Estuarine Water’ load limits for Total Suspended Solids (TSS) and Biochemical Oxygen Demand (BOD) during this licence period. EPA action determined as part of scheduled inspection program 1
M2.2 One sample not collected at the required 6 day frequency EPA action determined as part of scheduled inspection program 1
L7.1 Dry weather overflow from a directed overflow structure. EPA action determined as part of scheduled inspection program 1
L7.1 Dry weather overflow from a directed overflow structure. EPA action determined as part of scheduled inspection program 1